Status 2022-05-19

Home Forums Start Up recovery Status 2022-05-19

Viewing 0 reply threads
  • Author
    Posts
    • #10414
      Galan
      Keymaster

      Cycle 8 was delayed while we did a massive bug hunt. Cycle 9 was processed 1 month later but ran into problems with player turn submissions. Some folks thought they had submitted a turn, but the system did not have it. Some submitted a turn for a position but they put the wrong position number in the file – thus overlaying someone else’s turn. This was brought about by the new Excel turn sheets. On the plus side, they do a great job of eliminating input errors by the players.

      We are creating a new input system where the players will get back an email after they submit with details about the submission, what position it was for and eliminate the ability to submit a turn for a position they do not control.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.